COGNOiSe.com - The IBM Cognos Community

IBM Cognos 8 Platform => COGNOS 8 => Analysis Studio => Topic started by: pooja on 23 Dec 2009 10:40:10 AM

Title: reg-analysis studio
Post by: pooja on 23 Dec 2009 10:40:10 AM
this is a issue with analysis studio
we have a columns with 1 measure and 2 calculated columns.
also we have YTD on top of these 3-colm.Now we need to add all 2009 months columns after these YTD columns.
I have been trying a lot..but not succed yet.
Pleas let me know if there is any way out..ASAP
thank you so much in advance
Title: Re: reg-analysis studio
Post by: MFGF on 23 Dec 2009 11:07:03 AM
Hi,

Assuming you are using 8.4, simply select the months below 2009 and drag them to the right of the YTD column in the analysis.  You will then probably need to add your measure and calcs below the months too.

If you're on a version prior to 8.4, different hierarchies from the same dimension are not supported in an Analysis Studio crosstab, so you will need to upgrade.

MF.
Title: Re: reg-analysis studio
Post by: pooja on 23 Dec 2009 11:29:05 AM
I tried that way..didn't worked out
I am using 8.1
Title: Re: reg-analysis studio
Post by: MFGF on 23 Dec 2009 12:55:43 PM
Yep - as mentioned previously, you need to be on 8.4 or you can't do it in Analysis Studio.