In Report Studio, is there a method to generate the same report multiple times, passing different parameters for each iteration? The reports would need to be saved to a file, also.
Yes.Create a report views for the report.For each report view set different parameter values and schedule it to run in the required format.
Thanks. That was what I was looking for, but left off the second half of my question. How to use single job to execute all the views?