COGNOiSe.com - The IBM Cognos Community

IBM Cognos 8 Platform => COGNOS 8 => Report Studio => Topic started by: lifzgud on 18 Sep 2009 04:15:23 AM

Title: Save older versions in scheduling
Post by: lifzgud on 18 Sep 2009 04:15:23 AM
Hi,
I am trying to schedule a report to save it in a particular location through Cognos Connection.
I want the older versions of the report as well
I dont want it to overwrite the older one