IBM Cognos 8 Platform => COGNOS 8 => Report Studio => Topic started by: lifzgud on 18 Sep 2009 04:15:23 AM
Title: Save older versions in scheduling
Post by: lifzgud on 18 Sep 2009 04:15:23 AM
Hi, I am trying to schedule a report to save it in a particular location through Cognos Connection. I want the older versions of the report as well I dont want it to overwrite the older one