Hi.
We are in process of migration from series 7 to cognos8.
What is exact process of deplying the cubes build thru transfomer to cognos connection.
can we schedule this copy cubes to cognos connection on daily basis.
If so what is the exaact process of deplaying the mdc to cognos connection.
Thanks.
Each cube has to be loaded as a data source. This can be done either in Framework Manager (need to publish) or within Cognos Connection.
With regards to updating and scheduling, hopefully someone else will be able to help.
Which Cognos 8 version you're going to upgrade?
Transformer 8.1, Transformer 8.3, and Transformer 8.4 have some differences between each version.