In a transformer model build I get a line
"Updating the PowerCube with currency data"
I have no currency in the model and because I have a number of sub cubes this is taking quite alot of time (6 minutes per sub cube with about 12 of them).
Does anyone know how to disable?
a couple of things spring to mind:
* confirm that there is not a currency table or data loaded
* confirm that none of the measures have the "Allow Currency conversion" selected
good luck!
DW
I think it is better if you check first the things that revolve in your currency. Doing this will change or transform the powercube with currency data. You have to do it as soon as possible.