Hi All,
just wondering if there are any limits on the number of export jobs that can be contained in one "main" export job.
I'm doing a tenant export, so I created an export job for each tenant individually. These jobs are not scheduled.
Then I created a main export job which I select all the individual tenant export I created. And this is the one that is scheduled to run.
Would an export job be able to contain 1000+ individual tenant exports?
sdf