Installed 11.0.6, exported our 10.2.2 Content Store and imported to 11.0.6. Now all Schedules show Unavailable Links, although they run, and all reports show Unavailable package but they run. Did I miss a step somewhere? When I open a report and save the package gets linked. However I cannot do that on all reports and surely do not want to do all the scHedules and emails!
I didn't see that, but there are other, basic features you may want to test.
http://www.cognoise.com/index.php/topic,32931.0.html
We are having a similar issue on 11.0.6. We restored CM from production for testing on Cognos 11.0.6. All the reports and schedules seem okay. If I have to modify a package and 'move' onto the current package the reports are linking to, once I move the package, the reports lose linking and say package is 'Unavailable' in Properties > Report > Package. For Cognos 10.2 when googling to get around this issue you need to add to the .../ps/system.com <param name="updateTargetObjectWhenOverwrite"&g t;true</param>. Do I need to do this on 11.0.6? We are going from 10.1.1 to 11.0.6.