COGNOiSe.com - The IBM Cognos Community

IBM Cognos Analytics Platform => Cognos Analytics => Administration and Security => Topic started by: dpccgf on 30 Apr 2017 11:13:03 PM

Title: Testing 11.0.6 Upgrade
Post by: dpccgf on 30 Apr 2017 11:13:03 PM
Installed 11.0.6, exported our 10.2.2 Content Store and imported to 11.0.6.  Now all Schedules show Unavailable Links, although they run, and all reports show Unavailable package but they run.  Did I miss a step somewhere?  When I open a report and save the package gets linked.  However I cannot do that on all reports and surely do not want to do all the scHedules and emails!
Title: Re: Testing 11.0.6 Upgrade
Post by: dougp on 01 May 2017 10:38:00 AM
I didn't see that, but there are other, basic features you may want to test.

http://www.cognoise.com/index.php/topic,32931.0.html

Title: Re: Testing 11.0.6 Upgrade
Post by: CognosChai on 02 Aug 2017 03:36:28 PM
We are having a similar issue on 11.0.6.  We restored CM from production for testing on Cognos 11.0.6.  All the reports and schedules seem okay.  If I have to modify a package and 'move' onto the current package the reports are linking to, once I move the package, the reports lose linking and say package is 'Unavailable' in Properties > Report > Package.  For Cognos 10.2 when googling to get around this issue you need to add to the .../ps/system.com <param name="updateTargetObjectWhenOverwrite"&g t;true</param>.  Do I need to do this on 11.0.6?  We are going from 10.1.1 to 11.0.6.