Hi all,
i created a report by using TM1 cube as a data source in Report studio. Now i want to add new TM1 cube in that particular package ,
I tried to add the new cube in the same FM Model and imported the package in cognos connection, but in cognos connection two cubes
are showing two different packages.
I want two cubes in same old package .How can I do this.
Thanks,
Karthee
Quote from: karthik12345 on 23 Mar 2016 05:53:44 AM
Hi all,
i created a report by using TM1 cube as a data source in Report studio. Now i want to add new TM1 cube in that particular package ,
I tried to add the new cube in the same FM Model and imported the package in cognos connection, but in cognos connection two cubes
are showing two different packages.
I want two cubes in same old package .How can I do this.
Thanks,
Karthee
Either create a new package in Framework Manager and select both cube links for inclusion, or edit the original package definition and check the new cube link to add it.
Cheers!
MF.