Hello,
This is just a general query about the capabilities of Metric Studio. Our organization uses a relative database framework and we wanted to explore the idea of using Metric Studio to track some of the data items over a period of time. It is important to note that the relative database that we are currently using only tracks these data items at the current time and does not track them over a period of time. Can we accomplish this using Metric Studio (and Metric Designer if required) to access the relative database and store the data over a period of time? Can this be done without be creating data cubes or packages that modify the structure?
Thanks,
Suraj