Is there is an easy way to either export schedules so they are easier to recreate or devise a way to document scheduled reports so that we make sure we get them rescheduled correctly?
Maybe Metamanager or some other utility can do that but why would a DB upgrade cause a problem with existing schedules?
Its an Info EAM upgrade