Post by: kpiszcz on 27 Jul 2007 05:14:43 AM
I'm working with Report Studio/ Analysis Studio. I design crosstab in Report Studio with Cognos 8 BI and base on MS Analysis Services 2005 dimensions and hierarchies.
I'd like to make something like "Drill to top". There is way only to Drill up/down in drilling options.
Can you suggest any solution for that?
I have 5 levels in my hierarchy and it's difficult and annoying when you go down to the lowest level and then go back level by level up and up five times.
There is a way by refreshing or re running report but maybe someone can suggest something another to work with "Drill to Top".

I appreciate any help.
Thanks,
Krzysztof