Hi Cognoises,
does anyone know how to set/solve/simulate the Regular Timing: After Rollup in Cube Designer? I have calculated measure consisting of two other measures. I would need to set calculation after rollup to higher levels is finished.
Any hints please ?
Thanks
Quote from: raztos on 09 Dec 2014 02:42:48 AM
Hi Cognoises,
does anyone know how to set/solve/simulate the Regular Timing: After Rollup in Cube Designer? I have calculated measure consisting of two other measures. I would need to set calculation after rollup to higher levels is finished.
Any hints please ?
Thanks
Hi,
Just double-click on your calculated measure and make sure the "Regular Aggregate" property is set as "Calculated".
Cheers!
MF.