Good day,
I want to schedule a report after the ETL load.
When ever the ETL load is done a flag will be populated in the database with the Date.
Must i use event studio or a Trigger based scheduling and how to do that?
Thanks a lot
Event Studio would be able to handle that. You will need to have the flag field modeled and available in a package.
Here is a link to the event studio user guide.
http://pic.dhe.ibm.com/infocenter/cfpm/v10r1m0/index.jsp?topic=%2Fcom.ibm.swg.im.cognos.ug_cr_es.10.1.0.doc%2Fug_cr_es_id155event_studio.html