COGNOiSe.com - The IBM Cognos Community

IBM Cognos 8 Platform => COGNOS 8 => Report Studio => Topic started by: sg24 on 25 Aug 2011 09:27:48 AM

Title: Urgent- date issue
Post by: sg24 on 25 Aug 2011 09:27:48 AM
Hi Folks,

I have filter in the query and the columns in the called hiredate and termination date . these two col are coming from the data base. And there is one more col called Effective date which is a calculated column with case statements.

I have a filter included in the report as effective date <=termination date and effective_date>=hiredate.

Now i need to take the hiredate and termination date based on the effective date and pull that hiredate and termination date in the report. 

Please let me know if u folks hav any idea...

Thanks,
Shilpa
Title: Re: Urgent- date issue
Post by: MFGF on 25 Aug 2011 11:16:04 AM
Hi,

I'm not clear on what you mean by

QuoteNow i need to take the hiredate and termination date based on the effective date and pull that hiredate and termination date in the report.

What does "pull ... in the report" mean? You want to remove them? Pull them in? Pull them into some sort of calculation? Pull them around to different locations?

If you can be more specific about what you're trying to do, we may be able to help.

Regards,

MF.
Title: Re: Urgent- date issue
Post by: sg24 on 26 Aug 2011 08:00:23 AM
Thank you for the response. I meant to include the column in the list. However that is resolved now.  :)