Hey All,
Never experienced drilling on charts as of yet, but I have a question before I start.
If I have a specific KPi and setup Drilling and then post the chart on a dashboard. Can I have it so the user decides to drill in the bar chart for more information, can the chart change automatically to another style chart. For example from a Gauge (1st level), drill in and Chart changes to a Bar Chart showing the new data?
Thanks
Jonathan
Not automatically, no. The user can manually choose to switch to a different chart type after drilling down, though.
MF.
There are no advanced functionalities in that like drill throughs.