If you are unable to create a new account, please email support@bspsoftware.com

 

News:

MetaManager - Administrative Tools for IBM Cognos
Pricing starting at $2,100
Download Now    Learn More

Main Menu

Scheduling report based on Database event

Started by M, 13 Aug 2013 09:32:01 AM

Previous topic - Next topic

M

Good day,

I want to schedule a report after the ETL load.

When ever the ETL load is done a flag will be populated in the database with the Date.

Must i use event studio or a Trigger based scheduling and how to do that?

Thanks a lot

Lynn

Event Studio would be able to handle that. You will need to have the flag field modeled and available in a package.

Here is a link to the event studio user guide.

http://pic.dhe.ibm.com/infocenter/cfpm/v10r1m0/index.jsp?topic=%2Fcom.ibm.swg.im.cognos.ug_cr_es.10.1.0.doc%2Fug_cr_es_id155event_studio.html